Updated: January 24, 2024
Did you want a hardwood floor? You may have already progressed far in the planning stage of this project, decided on wood and rooms, but the question arises: "How long does it take to install hardwood floors?". There is no universal answer here, much depends on the size of the room, the type of hardwood floors and the complexity of installation and acclimatization. On average, the installation of hardwood floors takes from 1 to 3 days or even a week. You can find out more in our article below.
Breaking Down the Installation Timeline
1 to 3 Days for Installation
Installing hardwood floors typically takes 1 to 3 days for a standard-sized room. Factors such as the type of hardwood, the complexity of the design, and the condition of the subfloor can influence the timeline. Including preparation, sanding, and finishing, the entire process may span from several days to a week or more for larger projects or custom designs.
Pre-Installation Preparation (2-4 Days)
It is impossible to start installation of hardwood floors without preparatory work. Mistakes at this stage can lead to problems in the further operation of the floors and you will not be able to notice signs of bad hardwood floors installation. This stage includes:
- Removing Existing Flooring: Removing the previous floor is necessary, even if it is a different hardwood floor. It is not possible to lay hardwood floors on top of carpet, tiles or laminate. The work may take only a few hours if we are talking about an ordinary one-bedroom or two-bedroom apartment, or it may take days if we are talking about a large room.
- Subfloor Preparation: The subfloor should be clean and even. It is very important. The dips must be filled in, the uneven areas sanded, and it may even be necessary to replace individual parts of the subfloor. If everything is fine with the subfloor and only "cosmetic" work is required, then it will take a couple of hours, but if thorough actions are required, then we are talking about days.
- Acclimating Hardwood Planks: Hardwood planks are very vulnerable to the microclimate, and therefore must match the ambient temperature and humidity during installation to prevent deformation or the appearance of gaps. This usually takes several days. Engineered hardwood floors cope with the adaptation much faster.
Installation (1-3 Days)
Next, we talk about the direct installation of the wood floors:
- Laying the Hardwood Planks: A simple patеern takes less time, while intricate designs can extend the process. If you are aiming for a complex herringbone or chevron styling, then it will take more time compared to a simple basic pattern.
- Custom Cuts and Fittings: Doorways, unusual layout, stairs, fireplaces will require more attention. If your project involves a lot of work with this kind of thing, then it can take a whole day, because it will require careful and careful laying and fitting of the wood planks.
- Securing the Planks: A lot depends on the type of wood floors, the slats are secured with nails, glue, or a combination of the two.
Sanding and Finishing (1-2 Days)
For unfinished or site-finished hardwood floors, sanding and finishing are necessary steps:
- Sanding: This process smooths out imperfections, preparing the surface for finishing.
- Applying Finishes: Multiple coats of finish are applied to protect the wood and enhance its appearance. Oil-based finishes may take longer to dry than water-based ones, influencing the timeline.
Factors That Affect Installation Timelines
1. Size of the Space
- #InstallationSpeed
- #TeamSize
- #SpaceSize
Installers can complete 750-1,000 square feet per day with a team of two professionals. Larger spaces naturally require more time, especially if there are multiple rooms or obstacles.
2. Type of Hardwood
- #MaterialChoice
- #Prefinished
- #Unfinished
Prefinished Hardwood: This option saves time as it doesn’t require sanding or finishing on-site.
Unfinished Hardwood: While customizable, this takes longer due to additional sanding and finishing steps.
3. Subfloor Condition
- #SubfloorPrep
- #Repairs
- #Leveling
An uneven or damaged subfloor can significantly delay the process. Common issues include subfloor leveling and repairs or complete replacements.
4. Customizations
- #DesignComplexity
- #Craftsmanship
- #TimeIntensive
Adding unique designs, such as herringbone or parquet patterns, can double or triple the installation time. Decorative elements like inlays or borders also require additional time and craftsmanship.
5. Accessories and Trim Work
- #FinishingTouches
- #Molding
- #Baseboards
Finishing touches such as baseboards, molding, and transitions add time to the project. While these are essential for a polished look, they often require meticulous measurement and fitting.
Tips for a Smooth Installation Experience
1. Communicate Openly with Contractors
Discuss the timeline, expectations, and potential challenges with your flooring professionals. Open communication ensures everyone is aligned and avoids surprises.
2. Prepare Your Home
- Clear the area of furniture and decorations.
- Ensure installers have easy access to the workspace.
3. Expect Noise and Dust
Hardwood floor installation involves tools that generate noise and dust. Contractors often use dust containment systems, but it’s good to prepare for temporary disruptions.
4. Plan for Flexibility
Unexpected issues, such as subfloor repairs, may require additional time. Build some flexibility into your schedule to accommodate these possibilities.
How Long Do Hardwood Floors Last?
A major advantage of hardwood floors is their longevity. With proper care, hardwood floors can last for decades, or even centuries. Here's what influences their lifespan:
- Quality of Installation: Properly installed floors are more durable and resistant to wear.
- Type of Hardwood: Hardwoods like oak and maple are extremely durable, while exotic options may require more care.
- Maintenance and Care: Routine cleaning, refinishing, and controlling humidity levels can significantly extend the life of your floors.
- Environmental Factors: Consistent indoor conditions help prevent damage from moisture or temperature fluctuations.
Tools to Estimate Your Timeline
To help you plan your project, here’s a quick reference guide:
Project Size | Estimated Days |
---|---|
500 sq. ft. (Small) | 2-3 Days |
1,000 sq. ft. (Medium) | 3-5 Days |
2,000+ sq. ft. (Large) | 5-7 Days or More |
Factor | Extra Time Needed |
---|---|
Subfloor Repairs | 1-2 Days |
Custom Patterns | Add 30%-50% to Timeline |
Accessories/Trim | 1-2 Days |
Conclusion: Plan Your Hardwood Floor Installation Today
Installing hardwood floors is a rewarding investment that enhances the beauty and value of your home. While timelines can vary, understanding the process and factors involved ensures you’re well-prepared. Partnering with experienced professionals guarantees a smooth and successful installation.
If you’re ready to begin your project, contact us today for expert guidance and personalized timelines. Let us help you achieve stunning hardwood floors that last a lifetime.